Air Liquide
GENERAL CONTRACTING & INDUSTRIAL SERVICES
Built for
critical work.
Integrated mechanical construction—from material supply and fabrication to heavy lifting and final installation.
LIFTING OPERATION
/ 01 — ABOUT MARVEL
We turn complex industrial requirements into reliable field results.
MARVEL delivers multidisciplinary mechanical construction with rigorous planning, controlled execution and a clear commitment to quality and safety.
TRUSTED BY INDUSTRY LEADERS
Our Clients.
MARVEL is proud to support leading organizations across the oil, gas, petrochemical and industrial sectors.
Air Liquide
TCI Sanmar
United Gas Derivatives Company — UGDC
Henkel
Giza Systems
Egyptian Maintenance Company — EMC
ISS/ 02 — CAPABILITIES
One team.
Full execution.
From the workshop to the field, our teams work to one standard: disciplined delivery without compromise.
Mechanical Contracting
Integrated mechanical construction delivered from planning through final handover.
Piping Fabrication & Erection
Workshop fabrication and site erection of industrial piping systems.
Steel Structure Fabrication & Erection
Fabrication, coating and erection of industrial structural steel.
Tank Fabrication & Erection
Fabrication, assembly, inspection and field erection of tanks and vessels.
Equipment Installation
Controlled lifting, alignment and installation of critical industrial equipment.
Heavy Lifting & Rigging
Engineered lifting plans, rigging coordination and precision positioning.
Sandblasting & Painting
Surface preparation and protective coating systems with inspection control.
Material Supply
Project material sourcing and supply with traceability and quality documentation.
/ 03 — LANDMARK PROJECT
HEAVY LIFTING · COMPLETEDTank Lifting
Operation.
A challenging lifting operation completed using a 600-ton mobile crane and a 500-ton crawler crane—planned and executed through disciplined rigging, coordinated teams and strict HSE controls.
/ 04 — FEATURED PROJECT
COMPLETEDTwo Pump Casings
/ Cold Boxes
Complete material supply, fabrication and installation of two critical industrial units—in accordance with approved drawings and project specifications.
- Material supply & traceability
- Workshop fabrication
- Critical lifting & positioning
- Final mechanical installation




/ 04 — PROJECT ARCHIVE
Proven across
the field.
MARVEL’s published industrial work—arranged chronologically by publication date and execution scope. Project films are included wherever available.
WORK ENTRIES
Scaffolding Safety — TBT Before Work Begins
At MARVEL sites, the daily pre-task Toolbox Talk brings management and the site team together to review planned scaffolding activities, discuss hazards and lessons learned, correct unsafe conditions, and agree controls before erection begins. The film then highlights MARVEL’s scaffold erection capability and industrial access work.
Integrated Site Facility — Civil, Steel & Modular Works
A compact site-facility showcase highlighting completed civil finishes, steel access works, fire-rated door fit-out, modular construction, and integrated electrical and control details—a focused example of MARVEL’s broader project delivery capability.
Safety Starts Before the First Task
At every MARVEL site, the morning Toolbox Talk brings management and teams together to review planned activities, discuss hazards and lessons learned, correct unsafe conditions and agree controls before work begins.
A Project Story — Chapter 3: The Project Takes Shape
Project works continue to take shape on site. MARVEL carries out the installation of the main steel structure and the related site works.
A Project Story — Chapter 2: The Structure Rises
The main steel structure takes shape. MARVEL’s scope covered erection and installation of the structure, followed by the remaining site works. The steel itself was manufactured by others.
A Project Story — Chapter 1: The First Lift
Chapter 1 of a three-part project story follows the lifting and positioning of heavy equipment on site. MARVEL’s project scope included installation of the main steel structure and execution of the other site works.






Workshop Piping Pre-Fabrication
Controlled workshop pre-fabrication of piping spools, covering material preparation, fit-up, welding and organized staging for inspection and site installation.
Piping Modification Works
Controlled piping modification works covering site preparation, safe access, support installation, alignment and disciplined execution inside an operating industrial facility.
Piping System Readiness
Final review of pipe routing, supports, connections and insulation completion—delivered under MARVEL quality and HSE controls, ready for inspection and handover.
170 Ton Horizontal Tank Lifting
Lifting and positioning using a 600-ton mobile crane and a 500-ton crawler crane under strict safety controls.
Two Pump Casings / Cold Boxes
Material supply, fabrication, critical lifting, precision positioning and final installation of two units.


Checker Plate Material Supply
Supply and controlled delivery of checker plates and steel materials, transported and received in line with project requirements.
CP-26Two Compressors Installation
Successful installation of two compressors under defined quality and safety controls.
SP-26Pipes & Supports Coating
Sandblasting and painting with the required inspections and tests.
EQ-26Heavy Equipment Installation
Coordinated lifting and installation activities led by engineering and site teams.
OG-26Oil & Gas Integrated Works
Piping, sandblasting, painting, equipment installation and hot tapping under QA/QC and HSE controls.
PW-25Industrial Piping Works
Completed industrial piping installation works, including routed pipework, supports and finishing across the operating facility.
CL-25CL₂ Gas Separator D-530
Supply and fabrication of A516 Gr.70 separator tank, including nozzles, support and NDT.
PM-25Industrial Piping Material Supply
Supply, unloading and controlled storage of piping materials and fittings under HSE requirements.

UGDC Steel Shed — Port Said & Damietta
Construction and erection of a new steel shed across the UGDC Port Said and Damietta plants.
LH-24Laundry & Home Care Power Plant
Mechanical and industrial construction works for the laundry and home-care production facility.

Demethanizer Project — Port Said
Dismantling corroded supports and platforms, hot-dip galvanizing, grating supply, and fabrication and installation of new platforms, supports and cable trays under controlled safety conditions.
AG-24Agiba & Giza Systems Project
Integrated project execution for Agiba and Giza Systems.

SAPESCO Sahara Petroleum Service Project
Field execution by the Zohr team for SAPESCO Sahara Petroleum Service under coordinated quality and safety controls.


D492A & T32281 Steel Tanks — TCI Sanmar
Construction of the D492A and T32281 steel tanks at TCI Sanmar Chemicals in Port Said, Egypt.

Gasko Firefighting Steel Tanks — Talkha
Supply of materials and construction of two firefighting water tanks for Gasko in Talkha, Dakahlia, Egypt, including fabrication, erection and welding activities.

HCL Storage Vessel — TCI Sanmar Chemicals
Supply of materials and fabrication activities for the HCL storage vessel project at TCI Sanmar Chemicals in Port Said.
ZH-23Zohr Field — Water Management Project
Piping and field execution for the Zohr Water Management Project, including installation activities performed under strict HSE controls.
TF-AIndustrial Tank Fabrication
Fabrication, assembly, inspection and testing of industrial tanks and vessels.
/ 05 — CORPORATE MILESTONES
Certified commitment.
Measured progress.
ISO Certification Achievement
ISO 9001:2015 Quality Management and ISO 45001:2018 Occupational Health & Safety Management certification.
ISO Certifications Renewed
Successful renewal reflecting MARVEL’s continued commitment to quality, safety and excellence.
UGDC Safety Campaign
Control of work, permit-to-work, risk assessment and shared HSE responsibility.


Safety Campaign
Shared commitment to control of work, permit-to-work, risk assessment and safe execution.


/ 06 — QUALITY & SAFETY
Standards are not a badge.
They are how we work.
Defined procedures, inspection discipline and HSE controls are embedded from planning through handover.
90012015
450012018
READY FOR THE NEXT CHALLENGE