MARVEL — ISO 9001:2015 and ISO 45001

GENERAL CONTRACTING & INDUSTRIAL SERVICES

Built for
critical work.

Integrated mechanical construction—from material supply and fabrication to heavy lifting and final installation.

170TON TANK
LIFTING OPERATION
MARVEL
CAPABILITYHEAVY LIFTING
EXECUTIONCONTROLLED & SAFE
PRECISIONIn every detail
SAFETYAt every stage
RELIABILITYOn every project

/ 01 — ABOUT MARVEL

We turn complex industrial requirements into reliable field results.

MARVEL delivers multidisciplinary mechanical construction with rigorous planning, controlled execution and a clear commitment to quality and safety.

SUPPLY+FABRICATION+INSTALLATION

TRUSTED BY INDUSTRY LEADERS

Our Clients.

MARVEL is proud to support leading organizations across the oil, gas, petrochemical and industrial sectors.

Air Liquide logoAir Liquide
TCI Sanmar logoTCI Sanmar
United Gas Derivatives Company — UGDC logoUnited Gas Derivatives Company — UGDC
Henkel logoHenkel
Giza Systems logoGiza Systems
Egyptian Maintenance Company — EMC logoEgyptian Maintenance Company — EMC
ISS logoISS

/ 02 — CAPABILITIES

One team.
Full execution.

From the workshop to the field, our teams work to one standard: disciplined delivery without compromise.

01

Mechanical Contracting

Integrated mechanical construction delivered from planning through final handover.

02

Piping Fabrication & Erection

Workshop fabrication and site erection of industrial piping systems.

03

Steel Structure Fabrication & Erection

Fabrication, coating and erection of industrial structural steel.

04

Tank Fabrication & Erection

Fabrication, assembly, inspection and field erection of tanks and vessels.

05

Equipment Installation

Controlled lifting, alignment and installation of critical industrial equipment.

06

Heavy Lifting & Rigging

Engineered lifting plans, rigging coordination and precision positioning.

07

Sandblasting & Painting

Surface preparation and protective coating systems with inspection control.

08

Material Supply

Project material sourcing and supply with traceability and quality documentation.

170TON

/ 03 — LANDMARK PROJECT

HEAVY LIFTING · COMPLETED

Tank Lifting
Operation.

A challenging lifting operation completed using a 600-ton mobile crane and a 500-ton crawler crane—planned and executed through disciplined rigging, coordinated teams and strict HSE controls.

LOAD170 TON
LIFTING FLEET600T + 500T
PRIORITYSAFETY & CONTROL

/ 04 — FEATURED PROJECT

COMPLETED

Two Pump Casings
/ Cold Boxes

Complete material supply, fabrication and installation of two critical industrial units—in accordance with approved drawings and project specifications.

  • Material supply & traceability
  • Workshop fabrication
  • Critical lifting & positioning
  • Final mechanical installation
PROJECT FILMSUPPLY · FABRICATION · INSTALLATION

/ 04 — PROJECT ARCHIVE

Proven across
the field.

MARVEL’s published industrial work—arranged chronologically by publication date and execution scope. Project films are included wherever available.

29DOCUMENTED
WORK ENTRIES
01
PROJECT FILM + FINAL VIEW
HSE · Scaffolding Safety

Scaffolding Safety — TBT Before Work Begins

At MARVEL sites, the daily pre-task Toolbox Talk brings management and the site team together to review planned scaffolding activities, discuss hazards and lessons learned, correct unsafe conditions, and agree controls before erection begins. The film then highlights MARVEL’s scaffold erection capability and industrial access work.

02
PROJECT FILM + FINAL VIEW
Civil Works · Steel · Modular Facilities

Integrated Site Facility — Civil, Steel & Modular Works

A compact site-facility showcase highlighting completed civil finishes, steel access works, fire-rated door fit-out, modular construction, and integrated electrical and control details—a focused example of MARVEL’s broader project delivery capability.

03
PROJECT FILM + FINAL VIEW
HSE · Toolbox Talks

Safety Starts Before the First Task

At every MARVEL site, the morning Toolbox Talk brings management and teams together to review planned activities, discuss hazards and lessons learned, correct unsafe conditions and agree controls before work begins.

04
PROJECT FILM + FINAL VIEW
Steel Installation · Site Works

A Project Story — Chapter 3: The Project Takes Shape

Project works continue to take shape on site. MARVEL carries out the installation of the main steel structure and the related site works.

05
PROJECT FILM + FINAL VIEW
Steel Structure · Site Execution

A Project Story — Chapter 2: The Structure Rises

The main steel structure takes shape. MARVEL’s scope covered erection and installation of the structure, followed by the remaining site works. The steel itself was manufactured by others.

06
PROJECT FILM + FINAL VIEW
Heavy Lifting · Equipment Installation

A Project Story — Chapter 1: The First Lift

Chapter 1 of a three-part project story follows the lifting and positioning of heavy equipment on site. MARVEL’s project scope included installation of the main steel structure and execution of the other site works.

07
PF-26
Piping · Workshop Fabrication

Workshop Piping Pre-Fabrication

Controlled workshop pre-fabrication of piping spools, covering material preparation, fit-up, welding and organized staging for inspection and site installation.

08
PROJECT FILM + FINAL VIEW
Piping · Site Execution

Piping Modification Works

Controlled piping modification works covering site preparation, safe access, support installation, alignment and disciplined execution inside an operating industrial facility.

09
PROJECT FILM + FINAL VIEW
Inspection · Quality Control

Piping System Readiness

Final review of pipe routing, supports, connections and insulation completion—delivered under MARVEL quality and HSE controls, ready for inspection and handover.

10
PROJECT FILM + FINAL VIEW
Heavy Lifting & Rigging

170 Ton Horizontal Tank Lifting

Lifting and positioning using a 600-ton mobile crane and a 500-ton crawler crane under strict safety controls.

11
PROJECT FILM + FINAL VIEW
Supply · Fabrication · Installation

Two Pump Casings / Cold Boxes

Material supply, fabrication, critical lifting, precision positioning and final installation of two units.

12
Checker Plate Material Supply delivery view 1Checker Plate Material Supply delivery view 2
PROJECT FILM + FINAL VIEW
Material Supply · Logistics

Checker Plate Material Supply

Supply and controlled delivery of checker plates and steel materials, transported and received in line with project requirements.

13
Two Compressors Installation — MARVEL published project mediaCP-26
Equipment Installation

Two Compressors Installation

Successful installation of two compressors under defined quality and safety controls.

14
Pipes & Supports Coating — MARVEL published project mediaSP-26
Surface Protection

Pipes & Supports Coating

Sandblasting and painting with the required inspections and tests.

15
Heavy Equipment Installation — MARVEL published project mediaEQ-26
Mechanical Installation

Heavy Equipment Installation

Coordinated lifting and installation activities led by engineering and site teams.

16
Oil & Gas Integrated Works — MARVEL published project mediaOG-26
Oil & Gas

Oil & Gas Integrated Works

Piping, sandblasting, painting, equipment installation and hot tapping under QA/QC and HSE controls.

17
Industrial Piping Works — MARVEL published project mediaPW-25
Piping Fabrication & Erection

Industrial Piping Works

Completed industrial piping installation works, including routed pipework, supports and finishing across the operating facility.

18
CL₂ Gas Separator D-530 — MARVEL published project mediaCL-25
Tank Fabrication

CL₂ Gas Separator D-530

Supply and fabrication of A516 Gr.70 separator tank, including nozzles, support and NDT.

19
Industrial Piping Material Supply — MARVEL published project mediaPM-25
Material Supply

Industrial Piping Material Supply

Supply, unloading and controlled storage of piping materials and fittings under HSE requirements.

20
PROJECT FILM + FINAL VIEW
Fabrication & Erection · Steel Structures

UGDC Steel Shed — Port Said & Damietta

Construction and erection of a new steel shed across the UGDC Port Said and Damietta plants.

21
Laundry & Home Care Power Plant — MARVEL published project mediaLH-24
Industrial Construction

Laundry & Home Care Power Plant

Mechanical and industrial construction works for the laundry and home-care production facility.

22
PROJECT FILM + FINAL VIEW
Platforms · Supports · Cable Trays

Demethanizer Project — Port Said

Dismantling corroded supports and platforms, hot-dip galvanizing, grating supply, and fabrication and installation of new platforms, supports and cable trays under controlled safety conditions.

23
Agiba & Giza Systems Project — MARVEL published project mediaAG-24
Oil & Gas

Agiba & Giza Systems Project

Integrated project execution for Agiba and Giza Systems.

24
PROJECT FILM + FINAL VIEW
Blowing Activity · Zohr

SAPESCO Sahara Petroleum Service Project

Field execution by the Zohr team for SAPESCO Sahara Petroleum Service under coordinated quality and safety controls.

25
D4-24
Steel Tank Construction · Port Said

D492A & T32281 Steel Tanks — TCI Sanmar

Construction of the D492A and T32281 steel tanks at TCI Sanmar Chemicals in Port Said, Egypt.

26
PROJECT FILM + FINAL VIEW
Material Supply · Fabrication · Erection

Gasko Firefighting Steel Tanks — Talkha

Supply of materials and construction of two firefighting water tanks for Gasko in Talkha, Dakahlia, Egypt, including fabrication, erection and welding activities.

27
PROJECT FILM + FINAL VIEW
Material Supply · Vessel Fabrication

HCL Storage Vessel — TCI Sanmar Chemicals

Supply of materials and fabrication activities for the HCL storage vessel project at TCI Sanmar Chemicals in Port Said.

28
Zohr Field — Water Management Project — MARVEL published project mediaZH-23
Piping · Oil & Gas

Zohr Field — Water Management Project

Piping and field execution for the Zohr Water Management Project, including installation activities performed under strict HSE controls.

29
Industrial Tank Fabrication — MARVEL published project mediaTF-A
Tank Fabrication

Industrial Tank Fabrication

Fabrication, assembly, inspection and testing of industrial tanks and vessels.

/ 05 — CORPORATE MILESTONES

Certified commitment.
Measured progress.

ISO Certification Achievement

ISO 9001:2015 Quality Management and ISO 45001:2018 Occupational Health & Safety Management certification.

ISO Certifications Renewed

Successful renewal reflecting MARVEL’s continued commitment to quality, safety and excellence.

UGDC Safety Campaign

Control of work, permit-to-work, risk assessment and shared HSE responsibility.

ISO 9001:2015QUALITY MANAGEMENT SYSTEM
MARVEL ISO 9001:2015 Quality Management System certificate
ISO 45001:2018OCCUPATIONAL HEALTH & SAFETY
MARVEL ISO 45001:2018 Occupational Health and Safety certificate
UGDC · 26 JUN 2024

Safety Campaign

Shared commitment to control of work, permit-to-work, risk assessment and safe execution.

MARVEL team attending the UGDC Safety CampaignUGDC Safety Campaign meeting attended by MARVEL personnel

/ 06 — QUALITY & SAFETY

Standards are not a badge.
They are how we work.

Defined procedures, inspection discipline and HSE controls are embedded from planning through handover.

Controlled quality processes Safety-led site execution
QUALITY MANAGEMENTISO
9001
2015
OCCUPATIONAL H&SISO
45001
2018

READY FOR THE NEXT CHALLENGE

Let’s build what
comes next.